All documents tagged with this AR226 identifier.
| Title / Summary | Year | AR226 Docket | Hash ID | Pages |
|---|---|---|---|---|
| The document outlines a work plan for a Verification Investigation (VI) and a RCRA Facility Investigation (RFI) related to C-8 (PFOA) sampling, detailing the analysis of water and soil samples to assess contamination levels and future monitoring needs. | 1991 | AR226-2418 | Ea6rKR0avajmywz2BxvE80mn | 2 |